March 14, 2019

Escondido Named One of the Hottest Neighborhoods in San Diego!

Visit San Diego recently featured Escondido as one of San Diego's hottest neighborhoods. From the article, "Just a stone's throw from everywhere in coastal San Diego, Escondido is a nature lover's dream. But it doesn't end there. This hilly city- "hidden," as its name means in Spanish-is waiting to reveal a world of arts, delicious eats, and one of the crown jewels of San Diego's craft beer scene." Read more here .

Council Holds Action Plan Workshop

The Escondido City Council and the City staff leadership team met in the Mitchell Room at City Hall on Wednesday to discuss the next Council Action Plan in a workshop format. The final plan will be available on the City's website in a few weeks once completed and approved.

Escondido in the News

From The San Diego Union-Tribune "J. Harry Jones/San Diego Union-Tribune

With the removal last year of dozens of view-blocking eucalyptus trees along the medians of Grand Avenue in Escondido's historic downtown area, a view of Bottle Peak was revealed for the first time in decades.

With the removal last year of dozens of view-blocking eucalyptus trees along the medians of Grand Avenue in Escondido's historic downtown area, a view of Bottle Peak was revealed for the first time in decades." Read more here:

http://www.sandiegouniontribune.com/communities/north-county/sd-no-grand-avenue-bottle-peak-20190228-story.html

A wonderful mention of one of Escondido's newest wineries, Cheval Winery , appeared in the LA Times this week. Read more here:

https://www.latimes.com/travel/la-tr-san-diego-new-craft-beer-and-wine-20190227-story.html

Small Business Growth Expected Along the 78 Corridor

More than 80% of small businesses along the 78 expect to grow financially over the next two years according to a study released last week by the San Diego Regional Economic Development Corporation and Innovate78. Read more by clicking the links below.

http://www.innovate78.com/connect/blog/study-85-percent-small-businesses-along-san-diego%E2%80%99s-78-corridor-anticipate-financial-gr

https://fox5sandiego.com/2019/03/12/north-county-small-businesses-expect-growth-to-continue-in-next-two-years/

BY THE NUMBERS

Public Works

 

 

 

Code Enforcement

 

Total Code Cases (Year To Date)

431

Business Licenses

Graffiti Restitution

Collected This Week

Collected Year to Date

$0

$1092.88

Fire

 

Total Emergency Responses (Year To Date)

3,275

Police

 

February Abandoned Vehicle Data

 

Building Division:

*Data reflects activity through March 8 of each year.

 

 

POLICE DEPARTMENT

Incidents

Traffic Division Investigates Fatal Collision

On March 3, 2019, at about 9:35 a.m., a 41 year- old female Escondido resident was driving a 2003 Mercedes sedan westbound on Valley Parkway toward Quince Street. Meanwhile, a 54-year-old male Escondido resident is driving a 1996 Toyota Tacoma pickup southbound on Quince Street toward Valley Parkway. Both parties entered the intersection and a collision occurred. The force of the collision caused the Tacoma to roll multiple times and the driver was partially ejected from the vehicle due to not wearing a seatbelt. The Tacoma rolled on top of the driver and pinned him between the roadway and the sidewalk. Multiple witnesses and an Escondido police officer lifted that Tacoma off of the driver. The driver of the Tacoma was transported to Palomar Medical Center and later died from his injuries. Alcohol is not a contributing factor.

Armed Man Arrested After Foot Chase

On February 24, 2019 at around 9:00 p.m., officers were dispatched to the area of Washington Ave. and Beechwood St. regarding a male seen running with a gun in his hand. The first officer to arrive sees the male, who is still armed, and immediately runs from the officer. During the ensuing foot pursuit, the male threw the handgun over a wall. The male was stopped by officers and the handgun was recovered. Gerardo Sambrano (27-year-old resident of Escondido) was arrested on several weapons and parole violation related charges.

COPPS Unit Extra Patrol Leads to Narcotics Arrest

On March 5, 2019, an officer assigned to the COPPS unit conducted extra patrol at Crazy Charlie's Carwash, located in the 1300 block of Las Villas Way, and observed six people loitering in the carwash stall. During a search of one of the adult subjects, the officer located 2.3 grams of methamphetamine. The person was arrested and charged with possession of a controlled substance.

Additional Extra Patrols Result in Second Narcotics Arrest

On March 7, 2019, an officer working a COPPS unit detail contacted three people in the 100 block of W. El Norte Pkwy for blocking the sidewalk. The officer conducted a search of one of the people and located over 6 grams of methamphetamine, a scale, individually packaged smaller amounts of methamphetamine, empty unused baggies and cash. The adult subject was arrested and charged with possession of a controlled substance for sales. During an interview, the person admitted to selling drugs at Crazy Charlie's Carwash and other locations in the area of El Norte Pkwy. and Centre City Pkwy.

COPPS

The COPPS (Community Oriented Policing and Problem-Solving) Unit is dedicated to increasing the quality of life for the residents of Escondido through pro-active responses to crime trends, quality of life issues, and addressing crime and public nuisance in Grape Day Park and at Maple Plaza.

  • 3 arrest
  • 32 citations
  • 45 extra patrols

GRANT APPLICATIONS:

  • None

FIRE DEPARTMENT

News

Escondido Fire Department personnel participated in the Annual Burn Institute Firefighter Boot Drive the morning of Wednesday, March 6, 2019. Several Fire Department employees volunteered their time at the intersections of Highway 78/Broadway and I-15/Via Rancho Pkwy from 6 a.m. to 9:30 a.m. The generous donations from commuters in Escondido totaled $5,947! All donations will benefit the Burn Institute, including their "Camp Beyond the Scars" program. ( https://www.burninstitute.org/camp-beyond-the-scars )

COMMUNITY DEVELOPMENT

Major Projects Update

The following major projects are being reviewed and coordinated by Planning, Engineering, Fire, Building and Utilities. The list of projects below encompasses recent project updates and/or milestones from last week.

Commercial / Office:

1. Escondido Research and Technology Center (ERTC) - West (Developer: James McCann) 2181 Citracado Parkway - A plan for a new two-story, 57,000 SF, 52-bed Palomar Rehabilitation Institute was submitted as a Plot Plan on July 31, 2017. The Plot Plan approval letter was issued on February 7, 2018. The grading permit is ready to be issued once Planning confirms information from the applicant that assures adequate parking is provided.

2. Escondido Research and Technology Center (ERTC) - East (Developer: James McCann) 2130 Citracado Parkway - Building plans for the first 71,656 SF medical office building in this approved medical complex area across from Palomar Hospital were submitted into plan check on October 9, 2018. Fire and Esgil have approved the plans. Planning has a hold on the permit until the parking issues below are resolved.

A Specific Plan Amendment (SPA) will be required to move the temporary parking lot on the medical building site (above) to another location within ERTC. The SPA application was submitted on November 13, 2018, and proposes the construction of a new temporary parking lot at the southern end of the ERTC development on Lots 10-15 and a permanent parking lot on Lot 1. Fire is requesting paving for all driveways in the proposed temporary parking lot. A comment letter regarding parking counts and storm water requirements was sent to the applicant in mid-December. The applicant provided a draft MOU document on January 4, 2019 (intended to be signed by applicant, PPH and City) explaining the phasing and proposed parking improvements. Revised parking lot plans for both the permanent and temporary lots were received on January 8, 2019. Planning met with the applicant on January 30, 2019, to discuss the plans and management of the proposed temporary parking lot. The plot plan and grading exemption for Lot 1 has been scheduled for a Zoning Administrator meeting on March 14, 2019.

3. Toyota of Escondido Certified Used Car Facility (Developer: Stephen Myers, Toyota of Escondido) 990 N. Broadway - A Plot Plan to assemble five commercial lots including a vacant used car business into an automotive sales and service facility for Toyota. The proposal includes the demolition of a vacant residence and a small expansion of an existing service building. The project application was submitted on January 7, 2019. Planning staff conducted staff-level design review on January 31, 2019. Comments from Planning, Engineering, Utilities, Fire and Traffic were sent to the applicant on February 5, 2019. Planning met with the applicant on February 28, 2019, to discuss proposed revisions to the plans. A revised Plot plan was resubmitted March 4, 2019.

Industrial

1. Escondido Self-Storage Facility (Developer: Brandywine Homes, Inc.) 2319 Cranston Dr. - Updated building plans were resubmitted into plan check on July 24, 2018. Esgil and Fire have approved the plans. Planning provided comments on the building plans on September 19, 2018. The final map was approved by City Council on September 19, 2018, and has recorded. The grading permit has been approved and the final improvement plan mylars have been signed. The building plans have been approved by Esgil and Fire. The Planning approval is still outstanding and awaiting minor plan revisions to be returned by applicant. Planning met with the project architect on January 29, 2019, to go over the requested revisions.

2. Citracado Business Park (Developer: Dentt Properties) 2207 Harmony Grove Road - A proposed specific plan for two industrial warehouse/office buildings (145,930 SF and 125,930 SF) with the buildings to be separated by the future extension of Citracado Parkway. The application was submitted on August 14, 2018. All departments have completed their initial review and comments were sent to the applicant on September 17, 2018. SDG&E also has provided comments regarding the high voltage power lines that traverse the site. The applicant's traffic consultant submitted revised methodology and distribution to Engineering on October 19, 2018. A meeting with the applicant to review the various departmental comments occurred on October 29, 2018. Another round of comments related to the proposed specific plan have also been provided. The developer recently indicated a revised submittal including the remaining environmental documents will likely be ready in about a week.

City Projects

1. Micro-Filtration Reverse Osmosis (Developer: City of Escondido Utilities Department) SE corner Ash/Washington - The City Council approved a contractual agreement with Black and Veatch for engineering services on April 4, 2018. A Request for Qualifications to solicit a Design/Build firm was released the first week of September 2018. On January 16, 2019, the City Council expressed continued support for the MFRO, but directed staff to investigate moving the facility to another location. Utilities staff are investigating the feasibility of moving the MFRO to city property located at 901 W. Washington Avenue. An on-site meeting with the selected design-build and environmental contractors occurred on January 28, 2019. Preliminary geotechnical and survey work is underway. Helix Environmental Planning will be preparing the draft environmental documents. The AB 52 consultation letter will be sent to interested tribes next week. A Design Build Agreement has tentatively been scheduled for City Council consideration on April 3, 2019. The proposed Design Build Agreement with Filanc+BC Joint Venture provides for design and pre-construction services.

2. Lake Wohlford Replacement Dam (Developer: City of Escondido Utilities Department) - A Draft EIR was prepared and issued for a 45-day public review period that began on October 4, 2016 and closed on November 17, 2016. A field visit with staff from the state and federal wildlife agencies took place on May 11, 2017, to review biological mitigation requirements including an agency request for full mitigation for emergent vegetation at the eastern end of the lake that came into existence since the lake level was reduced for safety reasons. Staff sent a follow-up letter to the wildlife agencies on June 29, 2017, seeking clarification on the proposed biological mitigation requirements. Additional information has been compiled and analyzed by the City's biological consultants based on recent conversations with the agencies. The biological consultant and staff met with the wildlife agencies on November 28, 2018 to discuss a modified approach to fulfilling mitigation requirements. Written information summarizing what was discussed at the meeting was transmitted to the agencies on December 4, 2018.

Institutional

1. Escondido Assisted Living (Developer: Tigg Mitchell, Mitchell Group) 1802 N. Centre City Parkway - This CUP application for a 71,300 SF three-story, assisted living and memory care facility with 90 total units was submitted on October 31, 2017. The City Council authorized review of a General Plan Amendment request on March 21, 2018, which was necessary to review the request to allow a third floor for the building. A neighborhood meeting to discuss the project with interested residents was held on January 30, 2019. Public review of the draft Mitigated Negative Declaration (MND) closed on February 11, 2019, and no public comments were received. The Planning Commission provided a recommendation on the project on March 12, 2019. A City Council hearing has tentatively been scheduled for April 10, 2019

Residential

1. Safari Highlands Ranch (SHR) (Developer: Jeb Hall, Concordia Homes) 550 lots east of Rancho San Pasqual - A Notice of Availability for the Draft EIR was issued on October 16, 2017 for public review and comment. The comment period ended on January 2, 2018. Staff transmitted all the comment letters and emails to the Draft EIR consultant for review and to prepare a response to each comment. The Draft EIR and appendices have been posted on the City's website at the following link:

https://www.escondido.org/safari-highlands-ranch-specific-plan.aspx

The responses to comments have generated related revisions to the project design. The applicant's engineer submitted a revised tentative map on October 26, 2018. Generally, the amount of grading and the area of disturbance has decreased, while the overall number of 550 residential lots has remained the same. Engineering met with the project engineer and applicant on January 31, 2019, to discuss their comments on the revised tentative map. The revised tentative map and exhibits have been posted on-line at the link above. The applicant met with Traffic Engineering during the week of February 25th to discuss off-site mitigation. The applicant also met with staff and the biological consultant on March 11, 2019.

2. 18 lots at 701 San Pasqual Valley Rd (Developer: Bob Stewart) - Staff comments on the revised tentative map were issued the last week of July 2017. The applicant has occasionally engaged in discussions with various departments since that time, but has declined a staff offer to schedule a comprehensive meeting with all city departments. Another set of revised plans were submitted the week of November 26, 2018. Planning, Engineering and Utilities comments on the revised plans were issued on February 25, 2019.

3. The Villages at Escondido Country Club (Developer: Jason Han, New Urban West, Inc.) 380 residences - The City Council voted 3-2 to approve the project on November 15, 2017. The applicant submitted rough grading plans, drainage improvement plans and utility relocation plans for all three villages on May 7, 2018. There have been three rounds of plan checks on the rough grading plans since the original submittal and a permit-ready letter for rough grading was issued on August 31, 2018 and revised on September 4, 2018. Landscape plans were submitted on June 5, 2018, and a second submittal was received on October 2, 2018. The applicant submitted the final map and other improvement plans on July 9, 2018. Additional comments on the improvement plans, utility location plans, storm drain plans and all technical studies were provided by Engineering on September 11, 2018. Country Club Lane street improvement plans were submitted for first plan check on October 9, 2018, and Engineering comments were provided on November 21, 2018. A tree removal permit to remove trees on the former golf course property was issued by Planning on December 19, 2018. Fourth plan check for the Village 1 rough grading, improvement plans and landscape plans were submitted January 18, 2019, and Engineering comments are expected to be issued this week. Third plan check for final map and improvement plans for Village 3 submitted. Engineering comments were returned on March 12, 2019.

The approved tentative subdivision map, Final EIR and appendices, Specific Plan and other related information can be accessed on the City's website at the following link:

https://www.escondido.org/ecc.aspx

5. North Avenue Estates (Developer: Casey Johnson) 34 lots at North Ave./Conway Dr. -The City Council approved the project on January 10, 2018. LAFCO approved the annexation application on October 1, 2018, and the annexation has recorded. The new homebuilder, Taylor Morrison Homes submitted a Precise Development Plan to Planning on December 14, 2018. Grading plans, final map and improvement plans were submitted for review on December 7, 2018. Engineering comments were returned on January 18, 2019 and additional comments were sent on January 25, 2019. Engineering met with the applicant's engineer on January 31, 2019 to discuss drainage issues. The Certified Tentative Map was submitted for substantial conformance review on February 7, 2019. Planning and Engineering comments on the Certified TM were issued on February 25, 2019. A revised Certified TM was submitted on February 27, 2019. A revised Precise Development Plan was submitted on March 14, 2019.

6. Aspire (106 condo units on Municipal Lot 1) (Developer: Addison Garza, Touchstone Communities) - The proposal consists of a six-story mixed-use development across from City Hall on Parking Lot 1. The project was initially submitted for entitlement processing on June 23, 2017. Subsequent meetings with the applicant and staff have been on-going, and the most recent resubmittal of the project plans was received on May 10, 2018. Fire is awaiting confirmation that Maple Street will support the weight of their apparatus. A Traffic Impact Analysis has been provided and Planning is awaiting submittal of the rest of the environmental documentation for review. A meeting with the applicant occurred on September 12, 2018, to discuss remaining project issues. A purchase and sale agreement for the project site (Parking Lot 1) was approved by the City Council on September 19, 2018. Concerns regarding parking have been expressed; and the applicant's parking consultant submitted a parking study on January 17, 2019.

7. The Ivy (95 condo units at 343 E. 2nd) (Developer: Addison Garza, Touchstone Communities) - The condo project was initially submitted for entitlement processing for a 95-unit development on June 23, 2017. On February 8, 2019, the applicant submitted a revised project under state and city density bonus law that increases the number of dwelling units in return for the provision of 11 Very Low Income housing units. The increased density (now 127 units) was accommodated by adding another story to the development resulting in a five-story residential building up to 63 feet in height. While the building footprint is nearly identical to the previous design, the proposal also adds 1,175 square feet of commercial space on the ground floor at the corner of Second Avenue/Ivy Street. Utilities and Fire comments on the revised development plan were issued on March 12, 2019.

8. Grand Avenue Apartments (Developer: Norm LaCaze, Escondido Venture 99, LLC) 15 apt. units at 1316 E. Grand Ave . - A planned development application proposing 15 multi-family units in one three-story building on a vacant 0.51-acre lot was submitted for entitlement processing on September 22, 2017. The Planning Commission voted 6-0 to recommend approval of the project on February 12, 2019. A City Council hearing is scheduled for March 20, 2019.

9. Quince Street Senior Housing (Developer: Matt Jumper, 220 Quince, L.P.) 145 apartment units at 220 N. Quince St. - The five-story affordable senior housing apartment project was submitted on November 21, 2017. Multiple meetings with the applicant have taken place since the project submittal to discuss project design issues. A constraints map to identify fire access routes and locations of existing utilities has been approved by staff and the applicant utilized that map to submit a revised project on November 21, 2018. Staff comments from Planning, Engineering, Utilities and Fire were returned to the applicant on December 27, 2018. A follow-up meeting with Planning occurred on January 15, 2019, and revised project plans were submitted on February 12, 2019. All department comments are expected to be issued next week.

10. Sager Ranch/Daley Ranch Resort Specific Plan (Developer: J. Whalen Associates, Inc., Sager Ranch Partners) 203 housing units and 225-room resort hotel on 1,783-acres, just north and east of Daley Ranch - This proposed residential and resort hotel annexation and specific plan project was received on March 2, 2018. The project submittal has been deemed incomplete and a letter from staff requesting additional project related information was sent to the applicant on April 4, 2018. Requested information includes annexation exhibits, proposed general plan amendment text, a proposed Transfer of Development Rights Program, environmental initial study, and a fiscal impact analysis. Planning met with the applicant on May 17, 2018 to discuss items listed in the letter. A follow-up meeting to discuss engineering issues occurred on June 27, 2018. The applicant met with Escondido Fire and Valley Center Fire on August 1, 2018 to discuss fire protection issues. Significant fire-related issues to be addressed include the steepness of the project entry road, secondary emergency access and Fire Department response times. A follow-up meeting with the applicant to discuss these issues occurred on October 11, 2018.

A project webpage containing draft documents and plans has been added to the Planning Division's website at the following link:

Sager Ranch Resort Specific Plan - City of Escondido

11. Nutmeg Condo General Plan Amendment (Developer: Jim Simmons, CCI) 137 townhome condo units on 7.7 acres on both sides of Nutmeg between I-15 and Centre City Parkway - This proposed multi-family residential development includes a GPA from Office to Urban III (up to 18 du/acre) as well as a specific alignment plan for Nutmeg and a vacation of approximately one acre of public right-of-way for use in the project. The project application was received on June 15, 2018. Initial comments from Planning, Fire, Engineering, Utilities and Traffic Engineering were provided to the applicant on July 13, 2018. A Notice of Preparation for the project EIR was sent out on August 29, 2018, and the comment period closed on October 1, 2018. A Scoping Meeting occurred on September 6, 2018. The applicant submitted revised plans and studies on October 16, 2018. Engineering, Utilities and Fire provided comments on the revised plans on November 13, 2018. Follow-up meetings with the applicant occurred on November 28, 2018 and February 6, 2019. Traffic Engineering provided comments on the Traffic Impact Analysis on December 10, 2019. Staff comments on the first screen check draft of the EIR were issued on January 14, 2019. The applicant team met with Engineering and resubmitted revised plans and the second screen check draft of the EIR on February 6, 2019. Partial comments on the second screen check EIR were issued on March 11, 2019, with the remaining comments expected next week.

12. Oak Creek (Builder: KB Homes) 65 single-family residential lots on approximately 44 acres at Felicita Road and Hamilton Lane - The original developer, New Urban West, has secured permits from CDFW, ACOE and RWQCB. The Zoning Administrator approved a modification to the Precise Development Plan to revise the architecture on October 25, 2018. Grading, drainage and storm water management plans were submitted for first plan check on July 25, 2018. Fire and Engineering issued comments on the rough grading plan on September 4, 2018. Second plan check submittals for rough grading and off-site improvements were received on October 23, 2018. Fence and wall plans were submitted the second week of December. The model homes were submitted into plan check the last week of October and still require a Precise Grading Plan to be submitted. Second plan check submittal for the final map and third submittal for the on-site improvements is expected to be received this week. On-site remediation of hazardous materials has been completed in three of the four identified areas and a clearance letter from DTSC will be required prior to issuance of a grading permit. Planning has approved the entry guardhouse and project identification signs. Third plan check of final map submitted March 1, 2019. Planning is coordinating with the developer on vegetation removal. A fifth plan check of the rough grading plan (in PDF form) has been received and Engineering comments were issued on March 11, 2019. The bond and fee letter was issued a month ago.

13. Mercado 3-Story Mixed Use Building (Developer: Curtis Lively) 5 residences and 2 commercial suites on 0.14-acre at 510 W. 2 nd Avenue - A Plot Plan for five two-story residential units on top of 2,375 SF of commercial floor area and a parking garage was submitted July 13, 2018. Staff review comments were provided to the applicant who then submitted revised plans. Additional Planning and Engineering comments were sent to the applicant on September 27, 2018, and a revised project submittal was received on December 11, 2018. Comments from Fire, Utilities and Planning on the revised plans were sent to the applicant on January 2, 2019. The applicant submitted revised plans including a reduction of commercial space to 1,750 square feet on February 20, 2019. Utilities has provided comments.

14. 555 West Grand Mixed-Use Building (Developer: Ed McCoy) 32 condo units in three floors over a parking garage - This 32-unit mixed-use development with 610 SF of office/flex space was submitted as a planned development application on August 27, 2018. The project is seeking a reduction in parking and open space standards. Initial multi-department comments were sent to the applicant on September 26, 2018. The applicant met with Fire, Engineering, Planning and Utilities staff on October 16, 2018 to discuss the staff comments. Engineering has agreed to accept a public utilities easement along Quince Street in lieu of a dedication of public right-of-way. This easement along with a revision to provide vehicular access from Second Avenue has been incorporated into revised project plans and was submitted with an updated Traffic Impact Analysis on March 13, 2019.

15. Villa Portofino (Developer: Chris Post, ATC Design Group) 15 apartment units in a three-story building with parking garage at 2690 S. Escondido Blvd. - This 15-unit multi-family residential project on a 0.52-acre parcel between S. Escondido Blvd and Cranston Drive was submitted as a Plot Plan application on November 28, 2018. A comment letter was issued on December 20, 2018. Comments included the need to evaluate the building construction type for fire purposes and consider the design standards in the South Centre City Specific Plan. Planning staff have had several follow-up conversations with the applicant team and are awaiting revised plans.

16. Palomar Heights (Developer: Ninia Hammond, Integral Communities) Demolition and redevelopment of the old Palomar Hospital site with 424 multi-family units in 33 buildings - A proposed Tentative Map, Planned Development, Specific Plan Amendment and EIR to redevelop the 13.8-acre former hospital site. Up to 5,500 square feet of recreation or commercial space could be included. The project application was submitted on December 24, 2018. The initial plan submittal was presented to the Board of the Downtown Business Association on January 9, 2019, the Economic Development Committee of the Chamber of Commerce on January 10, 2019 and the Old Escondido Neighborhood Group on February 20, 2019. Engineering and Planning comments on the initial project submittal were sent to the applicant on February 12, 2019. A contract for a developer-funded planning consultant to work on this project as an extension of Planning staff was approved by the City Council on February 13, 2019. Planning Engineering and Fire met with the applicant team on February 27, 2019 to go through proposed revisions to the site plan and building designs. Comments from that meeting were provided to applicant team on March 5, 2019.

17. Henry Ranch (Builder: Joe Martin, Trumark Homes) An approved development of 97 single-family residential homes on 74.35 acres at the eastern terminus of Lincoln Avenue - The Tract 920 development proposal was originally approved in 2007 and an extension of the associated Development Agreement was approved in 2016. Trumark Homes acquired the property in 2018 and intends to complete the subdivision. A revised substantial conformance plan for the Certified Tentative Map was submitted January 15, 2019 and approved the last week of January. Final Map, grading plans and improvement plans were submitted for initial review on February 12, 2019, with staff comments expected to be provided by March 25, 2019. A demolition permit for the former packinghouse structures was submitted on February 14, 2019. Planning and Engineering provided comments on the demo permit on February 20, 2019, including the need to lead based paint and asbestos clearance as well as an erosion control plan. Architectural plans were submitted for Design Review on February 15, 2019, and comments were issued on March 14, 2019.

18. Accessory Dwelling Units - Planning staff is currently working on two applications for accessory dwelling units. Four accessory dwelling units have been approved so far this year. 24 accessory dwelling units were approved in 2018. Three accessory dwelling units were approved in 2017.

Building Division:

1. The Building Division issued 70 permits (including 28 solar photovoltaic) with a total valuation of $662,790.

2. Our building inspectors responded to 163 inspection requests. 172 customers visited the Building counter during the week.

3. The Building Division issued 70 permits (including 28 solar photovoltaic) with a total valuation of $662,790.

4. Our building inspectors responded to 163 inspection requests. 172 customers visited the Building counter during the week.

5. No change from the previous. The Meadowbrook three-story apartment building with underground garage at 2081 Garden Valley Glen is preparing the building for final inspection. Building approved temporary gas and electric release on January 22, 2019.

6. No change from the previous. The Westminster Seminary at 1725 Bear Valley Pkwy so far has received final inspection approval and Temporary Certificates of Occupancy for all buildings except for Buildings B and H. Final building inspection was conducted for building B on March 4, 2019, and the contractor is working on the corrections.

7. No change from the previous. The Emmanuel Faith Church at 639 E. 17th Ave. received final inspection corrections on November 14, 2018 and they are working on the inspection corrections.

8. No change from the previous. The Veterans Village project at 1540 S. Escondido Blvd. has received approval for Temporary Certificate of Occupancy for testing and employee set up.

9. The Latitude 2 apartment project at 650 Center City Pkwy has received Fire final approval and foundation for carports for Building 3, drywall at Building 6, final building approval for Buildings 2, 3 and 4.

10. No change from the previous. The new two story church sanctuary building at 1864 N. Broadway has received rough framing approval.

11. The Citron multifamily project at 2516 S. Escondido Blvd. has received exterior lath approval for Building 8 and building final for Buildings 5, 9 and 10.

12. The new 105 room hotel at 200 La Terraza is requesting building final inspections which may take several weeks to complete.

13. No change from the previous. The four-story, 102,774 sf storage building at 222 W. Mission Ave. has received inspection approval from Fire for the fire alarm system.

14. No change from the previous. The new five-story storage building at 852 Metcalf St. has received slab approval in the southwest area of the building.

15. No change from the previous. The new Gateway Grand 126-unit apartment project at 700 W. Grand Ave. has received foundation for all pier footings for Building A and foundation and slab inspection for Buildings A and B and the clubhouse building and grade beams for building C. Wood framing is currently underway

16. No change from the previous. The new apartments at 917 W. Lincoln Ave has received inspection approval for roof sheathing. The project has 3 buildings and 9 total units.

ENGINEERING DEPARTMENT

Capital Improvements

1. 2018 Street Rehabilitation and Maintenance Project - This year's program will focus in residential areas south of Felicita and east of I 15 with major work on Citricado Parkway, Escondido Boulevard, Del Lago Boulevard, Centre City Parkway, Felicita Road, and Bear Valley Parkway. The replacement of concrete curb, gutter, and sidewalk is continuing along Bear Valley Parkway between Beethoven Road and Canyon Road neighborhoods. Asphalt repairs are underway along Sonata Neighborhood this week. For more information on the City's Street Maintenance Program including a comprehensive list of streets to be treated follow the link

(https://www.escondido.org/city-of-escondido-street-maintenance-program.aspx ).

2. Valley Parkway/Valley Center Road Widening Project: Calendar Day 409 - The project is substantially complete as of March 6. This will halt the calendar day count at 409 days. The project will now proceed towards close out with development of a punch list. Some minor construction activity will be observed over the coming weeks.

3. Transit Center Pedestrian Bridge Project - Transit Center Pedestrian Bridge and Spruce Street Channel Improvement Project bid opening was held January 24. The preconstruction meeting will be scheduled upon receiving a signed contract. Safety training for City staff working within North County Transit District right-of-way is set for next week.

4. Missing Link Project - Delivery and installation of the traffic signal poles for the Woodward Avenue/Broadway intersection is scheduled for this Thursday. The signal is set to be energized on March 19. Shipping of the pedestrian traffic signal poles is still scheduled for May 3.

5. HSIP Traffic Signal Project - No changes from that reported last week: The project will provide new traffic signals at Valley Parkway/Date Street and El Norte Parkway/Fig Street intersections. The project is funded by the Highway Safety Improvements Projects. The Notice to Proceed has been issued and the traffic signal poles have been ordered. The construction of the surface improvements will begin on May 6. All submittals have been reviewed and approved.

6. Tulip Street Improvements Phase IV - The construction of the project began on Monday March 11th with the clearing of vegetation. The project has 70 working days for completion.

7. Multi Neighborhood Street Light L.E.D. Retrofit Project - No changes from that reported last week: The project will upgrade 644 existing high pressure sodium lights with energy efficient L.E.D. fixtures. The project boundaries are Lincoln Avenue to the north, 13 th Avenue to the south, Ash Street to the east, and Upas Street to the west. The winning bid came in below the engineer's estimate which will allow for the installation of an additional 100 lights. The project preconstruction meeting was held on Thursday, February 21. The new light fixtures have an anticipated delivery date of April 17. The work to install will commence immediately after delivery.

8. Storm Drain Pipe Lining and Rehabilitation Project Phase1 - The project consists of 14 work zones and 3 Bid Alternate locations for the videoing, grouting, repairing, and lining of existing corrugated metal pipes (CMP) within the City's inventory. The project bid opening was January 10, 2019. Four Engineering contractors supplied bids. The apparent low bidder was Sancon Engineering Inc. with a bid of $841,310.00. The Engineers estimate for the project was $746,734.00. The preconstruction meeting scheduled for Tuesday, March 12 has been cancelled and will be rescheduled.

Private Development

 

1. Centre City Shopping Center - No changes to from that reported last week: The project has been walked and a punch list has been provided. The traffic signal contractor has completed all punch list items identified. The project is located at 425 West Mission Avenue.

2. Tract 932 - Canyon Grove Shea Homes Community - No changes from that reported last week: Engineering will be finagling additional houses this week. Of the 179 home lots developed since the start of construction on February 11, 2016, only 30 remain unoccupied.

3. Latitude II Condominiums by a Lyon Homes Partnership: Washington Avenue at Centre City Parkway - The release of two additional buildings for occupancy was issued this week.

4. Tract 934 - No changes from that reported last week: Is a 5 lot subdivision located at 1207 Gamble Street. The construction of the underground utilities is idled this week.

5. Veterans Village - The construction of the onsite concrete improvements is complete. The project will be walked to develop a punch list before final approval of the project.

6. KB Homes Oak Creek Project - No changes from that reported last week: The contractor is nearing completion of the remedial grading to remove unsuitable material from within the project. This is work is focused on 4 specific areas. The project is located at the intersection of Hamilton Lane and Miller Avenue.

7. Escondido Self Storage - No changes from that reported last week: The grading of the project is idled. Offsite utility construction has begun along Brotherton Road. The project is located at the southwest corner of Brotherton Road and Cranston Drive.

8. Citron Development - No changes from that reported last week: The contractor is raising to grade the manholes along Cranston Drive, between Las Palmas Avenue and Citracado Parkway.

9. ATT Facility Tank Relocation - Excavation for the new fuel cell has begun along 2nd Avenue. The existing fuel cell is located in parking Lot 4. This unit will be removed at the completion of the new fuel cell installation.

###