SPECIAL EVENTS 

No Special Events this week 

COMMUNITY DEVELOPMENT

Major Projects Update

Commercial / Office:

  1. Escondido Research and Technology Center – East (ERTC) (Developer: James McCann) No change from the following update reported last week: This is a 72,000 square foot medical office building proposed on the east side of Citracado Parkway across from Palomar Medical Center located at 2130 Citracado Parkway. A grading permit has been issued by the Engineering Division. Building plans have been submitted for plan check. The applicant has recently requested to install a temporary paved parking lot in this area to serve the hospital. A grading plan for the temporary parking lot was approved June 13, 2016. 
  1. Escondido Research and Technology Center – West (ERTC) (Developer: James McCann) No change from the following update reported last week: This is a 144,000 sq. ft. development involving two medical office buildings proposed on the west side of Citracado Parkway across from Palomar Medical Center located at 2097 – 2175  Citracado Parkway. A grading permit has been issued by the Engineering Division. Esgil and the Planning Division have approved the building plans. A fee deferral agreement has been signed and the building permit was issued June 23, 2016. A tentative parcel map (TPM) for office condominiums was approved on July 12, 2016. A Final Parcel Map was submitted by the applicant on July 25, 2016, and is currently being reviewed by Planning and Engineering. A modified building plan to add a linear accelerator is now being reviewed by staff.
  1. Centerpointe 78 Commercial (Developer: Lars Andersen, Pacific Development)No change from the following update reported last week: This project is a 45,650 sq. ft. supermarket and restaurant located at 925 N. Broadway. The project was approved by the City Council on December 9, 2015. Demolition of the former auto dealership has been completed down to the foundation. Grading plans have been submitted to Engineering and Planning for review. Building plans for the supermarket were submitted to the Building Division on September 14, 2016, and are being reviewed by Building and Planning staff. A boundary adjustment application to place the two buildings on separate parcels went to Planning on October 14, 2016.
  1. Westfield Theater (Developer: Kim Brewer, Westfield)No change from the following update reported last week: This project is a 10-auditorium movie theater totaling 57,600 sq. ft. located on the north side of the Westfield Mall. The project was approved by the City Council on November 4, 2015. 
  1. Felicita Development, LLC (Developer: Katherine Park, Creative Design Associates)No change from the following update reported last week: This project is a 140-unit hotel, and a gas station or office/residential care facility at the southeast corner of Felicita Rd. and Gamble Lane. The applicant and staff met with the architect to discuss building elevations, five-story height limitations and site design issues given the existing wetland constraints on the property. Additional technical analysis and coordination is needed to address traffic, biology, water and sewer service, geotechnical and storm water concerns, along with a market study for the proposed uses. The applicant met with the wildlife agencies and is responding to technical studies needed to complete the application. 
  1. Springhill Suites (Developer: Raj Patel, San Bernardino Hospitality LLC) – This project is a four-story, 105-suite hotel totaling 73,300 sq. ft. located at 200 La Terraza Drive. The hotel includes a small conference room and an enlarged lobby for serving continental breakfast. A revised set of grading plans has been approved since February and grading for the hotel site has now started. Building plans have been approved and permit fees were paid before the end of the year clearing the way for construction to commence. On January 3, 2017, a new ownership group met with the City Council Economic Development Subcommittee and staff to discuss renewing the now-expired Economic Incentive Agreement that had been granted to the original developer. It is anticipated that the City Council will consider the proposed Economic Incentive Agreement on January 25, 2017. 
  1. Escondido Auto Park Association (Developer: Tim Brecht, Escondido Auto Park Association) No change from the following update reported last week: The association is proposing to upgrade the existing electronic message sign along I-15. An application for a new regional market sign and an amendment to the Sign Ordinance to increase the allowable display area for a regional market sign was submitted to the Planning Division on May 6, 2016. The proposed sign would be located in the same location as the existing sign at a slightly lower height (73.5 feet) with approximately the same overall dimensions. The Planning Commission recommended approval of the new regional market sign and amendment to the Sign Ordinance on July 12, 2016. The City Council approved the new regional market sign and amendment to the Sign Ordinance on August 17, 2016. Building plans are currently being reviewed by staff and a building permit should be issued soon. 
  1. Downtown Courtyard Marriott Hotel (Developer: Craig Clark) – A modification to a Master Plan and a Precise Plan for a revised downtown hotel design consisting of 154 rooms in four stories over ground-level parking. The majority of the building would be located in the parking lot between city hall and the CCAE conference center.  The primary entry to the hotel would be from a redesigned entry drive with new porte cochere on Escondido Boulevard.  The hotel would operate the conference center and would provide a bistro and bar area for guests.  The application was submitted on November 18, 2016 for processing and review.  During the course of review, City staff transmitted comments incrementally to the applicant.  A final letter summarizing all requested revisions and/or corrections was sent to the applicant on December 22, 2016.  City staff met with the development team on January 10, 2017, to discuss the staff comment letter.  Revised plans are expected to be resubmitted soon. 

Industrial 

  1. StorQuest (Developer: The William Warren Group, Inc.)No change from the following update reported last week: This proposed project at 220 W. Mission Avenue involves a 102,500 sq. ft., four-story self-storage facility development with three in-line shops and a small office. The Planning Commission voted to recommend approval of the proposed General Plan Amendment, Planned Development and Zone Change on August 9, 2016. The project was approved by the City Council on September 14, 2016. A grading plan was submitted for review on November 3, 2016.  Building plans were submitted during the week of December 19, 2016. 
  1. Victory Industrial Development (Developer: Scott Merry, Badiee Development) – This project involves two industrial buildings totaling 91,000 sq. ft. (one building 55,500 sq. ft., second building 35,500 sq. ft.) located at 2005 Harmony Grove Road and a zone change from residential to Planned Industrial consistent with the updated General Plan. The Planning Commission voted to recommend approval of the proposed General Plan Amendment, Planned Development and Zone Change on August 9, 2016. It was approved by the City Council on September 14, 2016. Building plans were submitted into plan check the following day and are now being reviewed by staff. Staff is still awaiting submittal of a proposed boundary adjustment application with three property owners in the adjacent Harmony Grove Business Park that is needed to implement the project design. 
  1. Micro-Filtration Reverse Osmosis (Developer: City of Escondido Utilities Department) No change from the following update reported last week: The proposed project involves a Conditional Use Permit (CUP) for the development of a new City facility to provide advanced treatment for recycled water produced at the City of Escondido’s Hale Avenue Resource Recovery Facility (HARRF) for agricultural uses with the capacity for future treatment for indirect potable reuse. The facility would be sized for a total production capacity of 2.0 million gallons per day (mgd) and is located in utility-owned property at the corner of Ash street and Washington Ave. On July 20, 2016, the City Council approved a first-phase design contract with Black and Veatch for the design effort need to bring the new site design to the Planning Commission for CUP consideration. The Planning Commission approved the proposed CUP on December 13, 2016. The City Council hearing upheld the Planning Commission’s decision January 11, 2017. 
  1. Wastewater Collections Yard Expansion (Developer: City of Escondido Utilities Department)No change from the following update reported last week: The project involves development of 1.8 acres of a larger, approximately 15.4-acre site for the construction of a new wastewater collections yard and maintenance facility for the City’s Hale Avenue Resource Recovery Facility (HARRF) at 1521 S. Hale Avenue. The proposed facilities will consist of three separate pre-fabricated metal buildings 3,735 sq. ft. - 5,670 sq. ft. for collections; work bays and workshops for regular maintenance of vehicles and equipment. The project would require the processing of a Conditional Use Permit (CUP) and rezone. The Planning Commission held a public hearing and recommended approval on May 10, 2016. It was approved by the City Council on June 15, 2016. Grading, building and landscape plans are now being reviewed by staff for permit issuance.
  1. Escondido Self-Storage Facility (Developer: Brandywine Homes, Inc.)No change from the following update reported last week: A modification to a Master and Precise Development Plan for revisions to the design of a previously approved, but not yet constructed, self-storage facility with direct access to Brotherton Road near the intersection with Cranston Drive. The proposed project was submitted on May 11, 2016, and proposes approximately 77,500 SF of storage area in two buildings. The larger building is two stories over a basement with all interior loading. The smaller building is one-story with some exterior roll-up doors. The project site is also part of a five-lot Tentative Map for four residential lots and one commercial lot (Tract 900) that is concurrently being processed for an extension of time. The project was recommended for approval by the Planning Commission on September 13, 2016, and the City Council approved the project on October 12, 2016. Building plans were submitted the week of December 11, 2016. 
  1. Innovative Industrial Development (Developer: Scott Merry, Badiee Development) No change from the following update reported last week: This project involves a unique proposal in which two potential industrial development scenarios are being analyzed for the 5.76-acre site located at 1925 Harmony Grove Road, directly in front of the “Victory Industrial Development” described above. The first development scenario involves a single tenant building with 98,500 square feet and 197 parking spaces. The alternative scenario envisions three industrial buildings roughly within the same footprint as the single tenant proposal. The three industrial buildings would include a total of 86,000 square feet with 234 parking spaces. An industrial planned development application has been submitted along with a zone change from residential to Planned Industrial consistent with the updated General Plan. A Mitigated Negative Declaration was issued on November 7, 2016 and the public review period will close on November 28, 2016. The Planning Commission voted to recommend approval of this project on December 13, 2016. A City Council hearing has been scheduled for January 11, 2017. 
  1. HARRF Biogas to Energy Project (Developer: City of Escondido Utilities Department) No change from the following update reported last week: This project is a proposed Conditional Use Permit that will utilize the existing digester gas created during the sewage treatment process to power two generators with a combined output of 1,200 kW of power. The gas which is currently being flared on the site will be redirected for a useful purpose and used to offset the HARRF’s demand on utility natural gas and electricity from SDG&E. The project was approved by the Planning Commission December 13, 2016.  
  1. North American Self-Storage (Developer: Russ Colvin)No change from the following update reported last week: This project at 852 Metcalf proposes a 132,556 square foot, self-storage facility consisting of four stories over a full basement level on a 1.12-acre site in the M-1 zone. A Plot Plan application was submitted to Planning on September 14, 2016 and was extensively reviewed by all departments. The Planning Division issued a conditional letter of approval on December 21, 2016. 

Institutional

  1. John Paul the Great Catholic University (Developer: Kevin Meziere, John Paul the Great Catholic University)No change from the following update reported last week:  A Conditional Use Permit to expand the campus and student enrollment at 155 W. Grand Avenue was approved by the Planning Commission on December 8, 2015. The proposal includes improvements to the former H. Johnson site at 131 S. Broadway for studio and classroom space, and the former bank at 200 W. Grand Avenue for administrative offices and a student resource center. The proposed expansion would also increase the student enrollment from 300 to 1,200 students over the next several years.  The university hosted an open house for the student resource center on November 28, 2016. 
  1. Escondido United Reformed Church (Developer: Brent Cooper) No change from the following update reported last week: The project is an expansion for a phased, multi-year, master construction/development plan for a new 12,250 SF two-story sanctuary, conversion of existing buildings to a social hall, demolition of an existing social hall/classroom building (approx. 4,620 SF) and construction of approximately 5,250 SF for a nursery, multi-purpose room, classrooms for Sunday school at 1864 N. Broadway. Revised architectural plans were unanimously approved by the Planning Commission on June 14, 2016. The grading plans are now in plan check.
  2. Emmanuel Faith Community Church (Developer: Jim North, EFCC)No change from the following update reported last week: The project is a phased, multi-year construction and renovation program for the Emmanuel Faith campus that includes demolishing the existing children’s rooms and constructing a new nursery and children’s building for up to 200 children, construction of a two-story training center/youth complex, renovation of the existing high school/college building, conversion of the existing education center into an office and meeting room building, demolition of the existing café and construction of a new café, demolition and construction of a new maintenance building, construction of a new gathering plaza with baptismal outdoor water feature, and reconstruction and expansion of the existing worship center from 1,600 seats to 2,000 seats. The Planning Commission approved the proposed modification to the Conditional Use Permit for the campus on June 9, 2015. Grading, building and landscape plans for the first phase (45,414 square foot new children’s building) are being reviewed by staff and Esgil.  

Residential 

  1. Oak Creek (Developer: Jason Han, New Urban West)No change from the following update reported last week: This project is a 65-unit single family development located at the southeastern corner of Felicita Road and Hamilton Lane approved by the City Council in 2015. The LAFCO Board unanimously approved the annexation on October 5, 2015, and the annexation has been recorded. No grading or improvement plans have been submitted by the developer at this time. 
  1. Amanda Estates (Developer: Jason Han, New Urban West) No change from the following update reported last week: This project is a 22-unit single family development on Amanda Lane approved by the City Council in 2015. The LAFCO Board approved the reorganization (annexation) at their meeting on August 3, 2015, and the annexation has been recorded. No grading or improvement plans have been submitted by the developer at this time. 
  1. Pradera (Developer: Moses Kim, Lennar Homes)No change from the following update reported last week: This project consists of a 70-unit single family development located at the northeastern corner of Ash Street and Lehner Avenue. The developer has obtained building permits for six phases involving 52 homes and those phases are under construction. Homebuyer interest in the product remains high and sales are progressing.  All five final maps in the project have now recorded. Precise grading plans for all phases have now been approved.  Phases 7 and 8 for the construction of 11 additional homes were received on December 12, 2016. 
  1. Lexington (Zenner) (Developer: Eric Johnston, KB Homes) – The project is a 40-unit, single-family development at the northeastern corner of Lehner Avenue and Vista Avenue. The three model homes on the eastern side of Ash Street are now open and sales are progressing as expected. A rough grading permit was issued for the project site on August 18, 2016 and grading is underway. The final map has been approved by City Council. The precise grading plan for Phase 1 has been approved. Building plans for Phase 1 were submitted into plan check on December 20, 2016 and permits were issued before the end of the year. 
  1. Stella Park Condominiums (Developer: Edward Kaen, ETP, LLC) – This project is a 65-unit, three-story townhome Planned Development located at 2516 S. Escondido Blvd. The project includes three separate recreation areas for residents. The City Council approved the project on April 27, 2016. A Substantial Conformance TM and proposed modification to the Precise Development Plan was filed by Lyon Homes on December 12, 2016. All departments are working steadily to provide necessary information to meet Lyon’s timeline and a staff letter covering both tentative map and architectural comments was provided to Lyon Homes on January 6, 2017. 
  1. Wohlford (Developer: Jack Henthorne) No change from the following update reported last week: This project is a 55-unit single family development located on Bear Valley Parkway east of Encino Drive. A Specific Alignment Plan for Bear Valley Parkway detailing the proposed roadway design is under review. The EIR consultant has submitted the first screencheck version of the Draft EIR for staff review. Staff has provided comments and a second screencheck is expected by the end of January. An application for a Development Agreement has recently been submitted by the applicant. 
  1. Latitude II (Developer: Peter Zak, Lyon/NCA)No change from the following update reported last week: This project is a 112-unit multi-family development, located at the northeastern corner of Centre City Parkway and Washington Avenue, and approved by the City Council on August 19, 2015. A Final Subdivision Map has been submitted for review and is awaiting approval of a boundary adjustment for a property exchange with the adjacent motel owner. The Final Map is scheduled for City Council approval on January 25, 2017. Grading and building plans are nearing approval. 
  1. Canyon Grove Estates Tract 932 (Developer: John Vance, Shea Homes) No change from the following update reported last week: This project is a 179-lot single family residential development on the north side of Vista Avenue east of Conway Drive. The final architectural design and landscaping plans for the Precise Plan application were approved by the Planning Commission on June 14, 2016. A rough grading permit has been issued and grading is underway. The Final Map has been approved by the City Council. Precise grading plans for the model complex and a model home permit have been approved. Building plans for the construction of eight model homes have been issued and construction is underway. Building permits for 16 additional homes are nearly ready to issue and the remainder of the homes are now in for building plan check.  The applicant is coordinating the plan review for off-site street improvements on Ash Street with the County’s Department of Public Works. 
  1. Safari Highlands Ranch (SHR) (Developer: Jeb Hall, Concordia Homes) No change from the following update reported last week: This project is a 550-unit single family development located east of the Rancho San Pasqual community and north of the San Diego Safari Park. The project involves 1,100 acres including annexation and a Sphere of Influence update for a master planned community with parks, trails, recreation center, fire station and open space. Planning and Engineering extensions of staff have been funded by the applicant and retained to assist the City in processing the project. The City Council approved the consultant contract for preparing the EIR on March 23, 2016. The contract planner has been meeting with the consultant, Michael Baker International (MBI), and has started review of first draft sections of the EIR. While the EIR is generally on schedule, there have been some changes to the site plan, which will affect the EIR schedule. The changes include the elimination of the “water factory” for wastewater treatment, elimination of the public park, changes to the entry road which would now be private instead of public, and relocation of the fire station to the former public park site. These changes will require the applicant’s civil engineer to make a number of revisions to the tentative map, but are not anticipated to affect the proposed development envelope or the number of proposed lots. A revised tentative map depicting the site plan changes was submitted on October 17, 2016, and is being reviewed by staff and the contract planner. 
  1. High Pointe Tract 693-J (Developer: Russell Schaeffer, True Life Communities) – No change from the following update reported last week: This project is a custom-home development with 39 estate lots accessed from Mesa Rock Road. Staff has prepared a bond and fee letter based on the proposed grading and landscape plans, and has sent it to the applicant. 
  1. Del Prado (Developer: Kerry Garza, Touchstone Communities)No change from the following update reported last week: This project is a 113-unit townhome-style Planned Development located at the southwestern corner of Brotherton Road and the Centre City Parkway frontage road. The project includes a recreational facility, pool, and open space areas. Staff worked through various site design and utility issues with the applicant prior to scheduling the project for a public hearing. The City Council approved the project on May 11, 2016. No grading or improvement plans have been submitted by the developer at this time. 
  1. 701 San Pasqual Valley Rd (Developer: Bob Stewart)No change from the following update reported last week: This project is a 19-unit single family development located at 701 San Pasqual Rd/1201 E. 5th Avenue (formerly Tract 898) on 7.2 acres. The application is under review and a letter detailing additional comments and submittal requirements was forwarded to the applicant. Additional information and revised plans were submitted to the Planning Division on June 13, 2016. Planning Division has reviewed the submittal and informed the applicant that it is still incomplete. 
  1. Veterans Village (Developer: Veterans Village of San Diego) No change from the following update reported last week: This project is a mixed-use development involving a 54-unit affordable multi-family residential apartment project for military veterans and their families. It includes on-site administration office, business center, club house and other support spaces for the residents; and a small commercial component to support training opportunities offered at the facility at 1556 S. Escondido Boulevard. Building plans have been submitted for review and comment; the grading plans and landscaping plans have been approved. Demolition has been completed.
  2. Escondido Gateway (Developer: Greg Waite, Integral Communities)No change from the following update reported last week: This project is a mixed-use development involving 126 residential units within three, 4-5 story buildings with indoor and outdoor recreational areas and an opportunity for a small (1,000 sq. ft.) commercial/flex space on 2.6 acres (48 dwelling units/acre) located at 700 W. Grand Avenue (former Police Station) across the street from the Escondido Transit Center. Plans were submitted for the project involving a Specific Plan Amendment, Tentative Map, Planned Development and Development Agreement. The City Council approved the project on October 12, 2016. Grading plans and a final map were submitted on November 17and November 21, 2016, and are currently being reviewed by staff. The Development Agreement has recorded. Building plans were submitted into plan check the week of December 11, 2016.
  3. The Villages at Escondido Country Club (Developer: Jason Han, New Urban West, Inc.) – The project would redevelop the former 109.3-acre Escondido Country Club golf course property with a new residential development consisting of 392 dwelling units including single-family detached and attached duplex units. The proposed project density is 3.6 dwelling units per acre with a minimum residential lot size of 2,555 square feet. The development would include 46 acres of open space including a landscaped greenbelt with a four-mile trail system linking park features. Other proposed amenities include a new clubhouse building, swimming pool, gym, tennis/pickle ball court, restaurant and bar and banquet facilities. The proposed General Plan Amendment, Specific Plan, Vesting Tentative Map and Zone Change applications and plans were submitted to the Planning Division on October 31, 2016. The plans are now being routed to City departments and agencies for comments. The developer has retained Dudek to prepare the Draft EIR for the project. The developer will fund a contract planner working under the direction of the Planning Division to assist the City in processing the project. A kick-off meeting was held on November 15, 2016, to commence project-related discussions between Planning staff and their contract planner, the applicant and the EIR consultant. A letter indicating the project application is incomplete was sent to the applicant on November 30, 2016. City staff met with the applicant on December 22nd to review the comment letter. It was conveyed to City staff that the applicant will resubmit in early 2017.
  1. Ivy/Valley Parkway Mixed-Use Development (Developer: Abad Rahan Pars Inc./ Norm Wieme, Architect – This project consists of a plot plan application to construct a four-story building with 20 two-bedroom apartment units and approximately 3,000 square feet of commercial space on a vacant 0.5-acre parcel located at 113 N. Ivy Street. The conditional letter of approval for the plot plan was approved and issued on September 19, 2016. The applicant has indicated that grading and building plans are expected to be submitted into plan check soon. 

Building Division: 

  1. During a short holiday week, the Building Division issued 42 permits with a total valuation of $270,516.
  2. Ten photovoltaic permits were issued for the week. The Building Division has issued 10 solar permits this year compared to 21 issued for the same time last year.
  3. Counter techs. assisted, on average, 28 customers per day with 23 customers on Friday.
  4. Building inspections averaged 22 inspections per day with 21 inspections on Friday.
  5. Permits were issued for the new 105-room Springhill Suites hotel at 200 La Terraza.
  6. Projects nearing permit issuance are:
  7. Latitude 2, a 112-unit apartment complex consisting of six, three-story buildings at 610-660 Centre City Pkwy.
  8. Veterans Village, a 40,000 square foot, three-story apartment building at 1540 S. Escondido Blvd.
  9. The construction of the City Plaza three-story, mixed-use building at 300 S. Escondido Blvd. has completed the podium slab and 2nd floor wall framing is progressing.
  10. Foundation inspections have been approved for all 8 model homes at Shea Homes Tract 932.
  11. The Solutions for Change affordable housing project at 1560 S. Escondido Blvd. has started wall framing for the project. 
  1. Roof framing is proceeding at The Meadowbrook three-story apartment building with underground garage at 2081 Garden Valley Glen.
  2. SDG&E is completing a utilities upgrade at Greencrest Mobile Home Park at 541 W. 15th Avenue and will be starting upgrades soon at the Town and Country Mobile Home Park at 2280 E. Valley Pkwy. and Citrus Gardens, 211 S. Citrus Ave.
  3. Escondido Disposal is receiving underground inspections for their conveyer pits associated with their large expansion and remodel.
  4. The Calvin Christian High School auditorium at 2000 N. Broadway has received masonry grout inspections for their exterior walls and roof framing is proceeding.

END OF THE YEAR BUILDING DIVISION 2016 STATISTICS 

 

2015

2016

Increase/ Decrease

Building Permits Issued

3,732

3,953

+6%

Building Permit Valuation

$44.6 mil

$69.6 mil

+56%

Single Family Dwelling Permits

20

81

+305%

New Mobile Home Permits

29

54

+86%

New Commercial Valuation

$2.8 mil

$18.2 mil

+545%

Building Inspections

7,691

8,776

+9%

Building Counter Contacts

8,829

8,776

-0.6%

Code Enforcement: 

  1. As of January 9, 2017, the total number of open code enforcement cases is 626 cases. During the prior week, 24 new cases were opened, and 44 cases were closed, with a backlog of an additional 32 cases not yet opened for assignment and investigation. 
  1. A total of 63 illegal signs were confiscated during the weekend. 
  1. Last week, the Business License Division issued 6 new licenses and received 28 new applications, in addition to 123 renewals. Fifteen businesses closed and/or closed out their business licenses. 

CAPITAL IMPROVEMENTS

2015/2016 Street Rehabilitation and Maintenance Project

The striping contractor has resumed tracking and striping operations along with the placement of bike legends on Tuesday, January 10 during a break in this week’s rain events. The final review is being completed on the remaining three striping plans this week with final striping being installed on all streets in the coming weeks. The Tree Notice explaining tree placement along the homeowner’s frontage will close on January 11, at that time staff will direct the contractor to order and install all 46 trees.  

PRIVATE DEVELOPMENT

Pradera - Lennar Communities
Final pavement installation is being planned for the next two weeks along Stanley Avenue, Ash Street and Lehner Avenue. All work will be performed during off peak hours and in conjunction with the other two projects in the area. 

Lexington Model Homes - KB Homes
The installation of the storm drain and sewer system along Ash Street between Lehner Avenue and Vista Avenue is continuing this week. All work will be performed between 8 a.m. to 2 p.m. Monday through Friday. Road closures during this time will be permitted with proper advanced electronic message boards notification. 

Escondido Boulevard at 3rd Avenue
The contractor has removed the false work on the first floor and preparing to move to the second floor. Lane closures along 3rd Avenue will be a regular occurrence to allow for the lifting of construction materials to the newly completed second floor.  

Tract 932 - Canyon Grove Shea Homes Community
The contractor is continuing the mass grading for the 179 housing units, the importing of material has resumed this week. The Ash Street/ Vista Avenue intersection has been reopened on Monday January 9 as scheduled, further improvements will continue once the necessary right of entry are granted by the San Diego County Water Authority to work over their existing facility. The contractor also wants to work around the next available school vacation period to maximize their construction efforts to complete the remain intersection improvements. Work on the new traffic signal installation at the Ash Street / Sheridan Avenue intersection is ongoing with the installation of conduit runs at Ash Street and Sheridan Avenue this week. 

Quantum Academy at Falconer Road
Escondido Elementary School District is installing a new water main to the existing facility. The project requires the relocation of an existing sewer lateral which will happen this Saturday. The following Tuesday the construction of the water main will begin and is expected to be completed in a four-week period. 

Latitude II Condominiums by a Lyon Homes Partnership: Washington Avenue at Centre City Parkway
Portions of the project are in for redesign, items include the upsizing of the water main as well as replacement of a portion of the sewer main which runs through the middle of the project. 

Westminster Theological Seminary Graduate Student Housing: Boyle Avenue at Bear Valley Parkway
The grading contractor has respraying all slopes as well as distributing water from the drainage basin to create more capacity in anticipation of the approaching storm later this week. The installation of the onsite private sewer system has resumed this week. 

Veterans Village 1556 S. Escondido Boulevard
The grading of the project has begun. 

Talk of the Town
A site meeting was held to determine the placement of ornamental street lights along the project street frontage. 

Tract 877 – Bernardo Ave. by Ambient Communities
No changes from that reported last week. The project is a 13 lot single family residential project located at the cul-de-sac end of Bernardo Ave. The Grading Permit has been activated, with the relocation of the emergency access gates along 11th Avenue. The grading operation will resume next week after the contractors completed implementing erosion control measures this past week in advance of the weekend rain event. 

POLICE 

INCIDENTS

  • On 01/01/17 a man called 911 to say that a family member had just tried to strike him with a tire iron, or similar metal rod, and also threatened to shoot the caller (although no firearm was seen). He was last seen leaving the location in a Chevy Astrovan. The suspect was identified as a parolee-at-large. Officers spotted the suspect in the passenger seat of the van at Valley and Midway. A hot-stop was conducted and Delgado was arrested without incident. A crowbar was located inside the van and identified as the weapon.  The suspect was booked for a parole violation and a charge of Assault with a Deadly Weapon.
  • On 01/01/17 at about 22:28 hours officers were dispatched to 204 Clark St. to investigate a robbery. Officers made contact with the victim wo was taken to PMC with swelling to his upper lip, right cheek, and right eye. He also had a laceration to his right check and damage to the iris of his right eye. The victim stated he was walking eastbound through Grape Day Park sometime between 19:45 hours and 22:00 hours near the fountain. Two males approached him from either side, struck him in the face and demanded money. When he said he had none, they struck him in the face again, causing him to lose consciousness for about two minutes. When he regained consciousness his wallet, which had been in his pocket, was discarded in the grass next to him. There was no loss of property. The victim cannot describe the suspects further and he stated that only fists were used to strike him.
  • On 01/02/17 at 02:30 hours, officers responded to rear of the Sunset Lounge regarding a person down and bleeding from the head. Upon arrival, officers located an unconscious male bleeding from the face in the rear parking lot. The witness (security/bouncer) stated he saw the victim surrounded by four or five people and being kicked in the head by at least two of the males in the group. When the bouncer yelled to stop, all the suspects fled north bound on foot and were not located. The bouncer could only describe the suspects as Hispanic males. The business has rear surveillance cameras covering the parking lot, but they were inaccessible at the time of the incident. The victim briefly regained consciousness with EFD before being transported. No information was obtained from the victim due to he being intubated upon arrival at PMC. Per the PMC ER staff, he likely suffered dual fractured orbitals and a broken nose.
  • On 01/03/17 Officer Solorio initiated a bike stop for a violation and the suspect immediately fled.  Officer Guerrero assisted and, in the process, broke his right, pinky finger after taking the suspect to the ground.  Suspect has priors for various drug and violence-related crimes and was taken into custody without further incident.  He was cleared at PMC for a laceration above his right eye as a result of the takedown by Officer Guerrero.
  • On 01/04/17, at approximately 06:40 hours, EPD received a call from 501 W. Mission #132 referencing a stab victim.  Officers arrive on scene and make contact with the victim who has sustained a single puncture wound to his back.  He was transported to Sharp Hospital for medical treatment.  Officer Wyse put together a photo line-up and the victim identified the suspect.  Officer A. Martinez located the suspect and arrested him without incident. 
  • On 01/04/17 at 17:09 hours a male subject was wandering at the Motel-6 at 900 N. Quince St, pulling on doors and shouting profanities at anyone who walked near him.  When officers arrived on scene, the subject threatened to kill police and shouted profanities while spitting toward officers. PERT-1 conducted a mental health evaluation/ threat assessment and took him into custody.  

EVENTS 

  • On 01/03/17 Chief Carter swore in our newest lateral police officer, Robert Meiselman. Robert spent two years with the SDPD before deciding to come work for EPD.