SPECIAL EVENTS 

  • Cal South State Cup youth soccer tournament
    Saturday, January 28, 8:00 a.m. to 4:30 p.m. and Sunday, January 29, 8:00 a.m. to 4:30 p.m.
    The tournament brings 120 teams and approximately 1,800 families to Escondido from all over Southern California. Cal South will be using all 8 fields for the 9 and above and 10 and above boys and girls divisions. Families will be dining, shopping, and lodging in Escondido and surrounding areas. 
  • 2017 State of the City Address
    Wednesday, February 22, 8:00 a.m. with an optional breakfast at 7:30 a.m.
    Escondido's Annual State of the City Address by Mayor Sam Abed will be held in the Conference Center of the California Center for the Arts, Escondido. The optional breakfast is available for $20 per person by prior reservation. The deadline to reserve breakfast is 5:00 p.m. on February 17. Persons wishing to attend only the program may do so at no cost, and no reservation is required. To purchase a ticket for breakfast visit www.escondido.org/state-of-the-city-address 
  • Dine Out Escondido!
    The fourth annual Dine Out Escondido! Restaurant Week is happening now through January 28. Thirty restaurants are participating this year. The City produces this event through Visit Escondido and in conjunction with Visit California’s January California Restaurant Month, enabling Escondido to leverage the vast reach of the statewide program. New to the program this year is a partnership with the North County Food Bank. All restaurant participants are donating $1 from each special sold to the Food 4 Kids Backpack program which benefits Lincoln Elementary. 
  • For information about other activities taking place in Escondido, please visit www.visitescondido.com 

ECONOMIC DEVELOPMENT 

The San Diego Regional Economic Development Corporation just launched a new research product this week called San Diego’s Economic Pulse. It includes comprehensive data on employment, new businesses, job postings and which companies are hiring throughout the San Diego region. Read this month’s edition 

For more information, contact Michelle Geller, Economic Development Manager, at mgeller@escondido.org or 760-839-4587 

COMMUNITY DEVELOPMENT

Major Projects Update

Commercial / Office:

  1. Escondido Research and Technology Center – East (ERTC) (Developer: James McCann) No change from the following update reported last week: This is a 72,000 square foot medical office building proposed on the east side of Citracado Parkway across from Palomar Medical Center located at 2130 Citracado Parkway. A grading permit has been issued by the Engineering Division. Building plans have been submitted for plan check. The applicant has recently requested to install a temporary paved parking lot in this area to serve the hospital. A grading plan for the temporary parking lot was approved June 13, 2016. Revisions to that plan are currently being reviewed. 
  1. Escondido Research and Technology Center – West (ERTC) (Developer: James McCann) No change from the following update reported last week: This is a 144,000 sq. ft. development involving two medical office buildings proposed on the west side of Citracado Parkway across from Palomar Medical Center located at 2097 – 2175 Citracado Parkway. A grading permit has been issued by the Engineering Division. Esgil and the Planning Division have approved the building plans. A fee deferral agreement has been signed and the building permit was issued June 23, 2016. A tentative parcel map (TPM) for office condominiums was approved on July 12, 2016. A Final Parcel Map was submitted by the applicant on July 25, 2016, and is currently being reviewed by Planning and Engineering. A modified building permit to add a linear accelerator has been approved. 
  1. Centerpointe 78 Commercial (Developer: Lars Andersen, Pacific Development)No change from the following update reported last week: This project is a 45,650 sq. ft. supermarket and restaurant located at 925 N. Broadway. The project was approved by the City Council on December 9, 2015. Demolition of the former auto dealership has been completed down to the foundation. Grading plans have been submitted to Engineering and Planning for review. Building plans for the supermarket were submitted to the Building Division on September 14, 2016, and are being reviewed by Building and Planning staff. A boundary adjustment application to place the two buildings on separate parcels went to Planning on October 14, 2016. 
  1. Westfield Theater (Developer: Kim Brewer, Westfield)No change from the following update reported last week: This project is a 10-auditorium movie theater totaling 57,600 sq. ft. located on the north side of the Westfield Mall. The project was approved by the City Council on November 4, 2015. 
  1. Felicita Development, LLC (Developer: Katherine Park, Creative Design Associates)No change from the following update reported last week: This project is a 140-unit hotel, and a gas station or office/residential care facility at the southeast corner of Felicita Rd. and Gamble Lane. The applicant and staff met with the architect to discuss building elevations, five-story height limitations and site design issues given the existing wetland constraints on the property. Additional technical analysis and coordination is needed to address traffic, biology, water and sewer service, geotechnical and storm water concerns, along with a market study for the proposed uses. The applicant met with the wildlife agencies and is responding to technical studies needed to complete the application. 
  1. Springhill Suites (Developer: Raj Patel, San Bernardino Hospitality LLC)No change from the following update reported last week: This project is a four-story, 105-suite hotel totaling 73,300 sq. ft. located at 200 La Terraza Drive. The hotel includes a small conference room and an enlarged lobby for serving continental breakfast. A revised set of grading plans has been approved since February and grading for the hotel site has now started. Building plans have been approved and permit fees were paid before the end of the year clearing the way for construction to commence. On January 3, a new ownership group met with the City Council Economic Development Subcommittee and staff to discuss renewing the now-expired Economic Incentive Agreement that had been granted to the original developer. The City Council approved an Economic Incentive Agreement on January 25. 
  1. Escondido Auto Park Association (Developer: Tim Brecht, Escondido Auto Park Association) – The association is proposing to upgrade the existing electronic message sign along I-15. An application for a new regional market sign and an amendment to the Sign Ordinance to increase the allowable display area for a regional market sign was submitted to the Planning Division on May 6, 2016. The proposed sign would be located in the same location as the existing sign at a slightly lower height (73.5 feet) with approximately the same overall dimensions. The Planning Commission recommended approval of the new regional market sign and amendment to the Sign Ordinance on July 12, 2016. The City Council approved the new regional market sign and amendment to the Sign Ordinance on August 17, 2016. A building permit for the sign was issued on January 19. 
  1. Downtown Courtyard Marriott Hotel (Developer: Craig Clark) No change from the following update reported last week: A modification to a Master Plan and a Precise Plan for a revised downtown hotel design consisting of 154 rooms in four stories over ground-level parking. The majority of the building would be located in the parking lot between City Hall and the CCAE conference center.  The primary entry to the hotel would be from a redesigned entry drive with new porte cochere on Escondido Boulevard.  The hotel would operate the conference center and would provide a bistro and bar area for guests.  The application was submitted on November 18, 2016 for processing and review.  During the course of review, City staff transmitted comments incrementally to the applicant.  A final letter summarizing all requested revisions and/or corrections was sent to the applicant on December 22, 2016.  City staff met with the development team on January 10, to discuss the staff comment letter.  Revised plans are expected to be resubmitted soon. 

Industrial 

  1. StorQuest (Developer: The William Warren Group, Inc.)No change from the following update reported last week: This proposed project at 220 W. Mission Avenue involves a 102,500 sq. ft., four-story self-storage facility development with three in-line shops and a small office. The Planning Commission voted to recommend approval of the proposed General Plan Amendment, Planned Development and Zone Change on August 9, 2016. The project was approved by the City Council on September 14, 2016. A grading plan was submitted for review on November 3, 2016.  Building plans were submitted during the week of December 19, 2016.
  1. Victory Industrial Development (Developer: Scott Merry, Badiee Development) No change from the following update reported last week: This project involves two industrial buildings totaling 91,000 sq. ft. (one building 55,500 sq. ft., second building 35,500 sq. ft.) located at 2005 Harmony Grove Road and a zone change from residential to Planned Industrial consistent with the updated General Plan. The Planning Commission voted to recommend approval of the proposed General Plan Amendment, Planned Development and Zone Change on August 9, 2016. It was approved by the City Council on September 14, 2016. Building plans were submitted into plan check the following day and are now being reviewed by staff. Staff is still awaiting submittal of a proposed boundary adjustment application with three property owners in the adjacent Harmony Grove Business Park that is needed to implement the project design. 
  1. Micro-Filtration Reverse Osmosis (Developer: City of Escondido Utilities Department)No change from the following update reported last week: The proposed project involves a Conditional Use Permit (CUP) for the development of a new City facility to provide advanced treatment for recycled water produced at the City of Escondido’s Hale Avenue Resource Recovery Facility (HARRF) for agricultural uses with the capacity for future treatment for indirect potable reuse. The facility would be sized for a total production capacity of 2 million gallons per day (mgd). A previous proposal for development of the facility at 2512 East Washington Avenue has now been shelved while staff pursues development of the facility on an alternative site located on the southeastern corner of Washington Avenue and Ash Street. On July 20, 2016, the City Council approved a first-phase design contract with Black and Veatch for the design effort need to bring the new site design to the Planning Commission for CUP consideration. Site and building design concepts have been developed and two neighborhood meetings were held on October 12, 2016 and November 3, 2016. A 30-day public review period for the proposed Mitigated Negative Declaration ended on November 27, 2016. The Planning Commission approved the proposed CUP on December 13, 2016. An appeal of that decision was filed and the City Council denied the appeal on January 11, and affirmed the Planning Commission’s decision to approve the project. 
  1. Wastewater Collections Yard Expansion (Developer: City of Escondido Utilities Department)No change from the following update reported last week: The project involves development of 1.8 acres of a larger, approximately 15.4-acre site for the construction of a new wastewater collections yard and maintenance facility for the City’s Hale Avenue Resource Recovery Facility (HARRF) at 1521 S. Hale Avenue. The proposed facilities will consist of three separate pre-fabricated metal buildings 3,735 sq. ft. - 5,670 sq. ft. for collections; work bays and workshops for regular maintenance of vehicles and equipment. The project would require the processing of a Conditional Use Permit (CUP) and rezone. The Planning Commission held a public hearing and recommended approval on May 10, 2016. It was approved by the City Council on June 15, 2016. Grading, building and landscape plans are now being reviewed by staff for permit issuance. 
  1. Escondido Self-Storage Facility (Developer: Brandywine Homes, Inc.)No change from the following update reported last week: A modification to a Master and Precise Development Plan for revisions to the design of a previously approved, but not yet constructed, self-storage facility with direct access to Brotherton Road near the intersection with Cranston Drive. The proposed project was submitted on May 11, 2016, and proposes approximately 77,500 SF of storage area in two buildings. The larger building is two stories over a basement with all interior loading. The smaller building is one-story with some exterior roll-up doors. The project site is also part of a five-lot Tentative Map for four residential lots and one commercial lot (Tract 900) that is concurrently being processed for an extension of time. The project was recommended for approval by the Planning Commission on September 13, 2016, and the City Council approved the project on October 12, 2016. Building plans were submitted the week of December 11, 2016. Grading and landscape plans and the final map have also been submitted and are being reviewed by staff. 
  1. Innovative Industrial Development (Developer: Scott Merry, Badiee Development)No change from the following update reported last week: This project involves a unique proposal in which two potential industrial development scenarios were analyzed for the 5.76-acre site located at 1925 Harmony Grove Road, directly in front of the “Victory Industrial Development” described above. The first development scenario involves a single tenant building with 98,500 square feet and 197 parking spaces. The alternative scenario envisions three industrial buildings roughly within the same footprint as the single tenant proposal. The three industrial buildings would include a total of 86,000 square feet with 234 parking spaces. An industrial planned development application has been submitted along with a zone change from residential to Planned Industrial consistent with the updated General Plan. A Mitigated Negative Declaration was issued on November 7, 2016 and the public review period closed on November 28, 2016. The Planning Commission voted to recommend approval of this project on December 13, 2016. The City Council approved the proposal as recommended by the Planning Commission on January 11. 
  1. HARRF Biogas to Energy Project (Developer: City of Escondido Utilities Department) No change from the following update reported last week: This project is a proposed Conditional Use Permit that will utilize the existing digester gas created during the sewage treatment process to power two generators with a combined output of 1,200 kW of power. The gas which is currently being flared on the site will be redirected for a useful purpose and used to offset the HARRF’s demand on utility natural gas and electricity from SDG&E. A Conditional Use Permit for the project was approved by the Planning Commission December 13, 2016.  
  1. North American Self-Storage (Developer: Russ Colvin) No change from the following update reported last week: This project at 852 Metcalf proposes a 132,556 square foot, self-storage facility consisting of four stories over a full basement level on a 1.12-acre site in the M-1 zone. A Plot Plan application was submitted to Planning on September 14, 2016 and was extensively reviewed by all departments. The Planning Division issued a conditional letter of approval on December 21, 2016. An erosion control and demo permit has been approved.

Institutional

  1. Escondido United Reformed Church (Developer: Brent Cooper) No change from the following update reported last week: The project is an expansion for a phased, multi-year, master construction/development plan for a new 12,250 SF two-story sanctuary, conversion of existing buildings to a social hall, demolition of an existing social hall/classroom building (approx. 4,620 SF) and construction of approximately 5,250 SF for a nursery, multi-purpose room, classrooms for Sunday school at 1864 N. Broadway. Revised architectural plans were unanimously approved by the Planning Commission on June 14, 2016. The grading plans are now in plan check. 
  1. Emmanuel Faith Community Church (Developer: Jim North, EFCC)No change from the following update reported last week: The project is a phased, multi-year construction and renovation program for the Emmanuel Faith campus that includes demolishing the existing children’s rooms and constructing a new nursery and children’s building for up to 200 children, construction of a two-story training center/youth complex, renovation of the existing high school/college building, conversion of the existing education center into an office and meeting room building, demolition of the existing café and construction of a new café, demolition and construction of a new maintenance building, construction of a new gathering plaza with baptismal outdoor water feature, and reconstruction and expansion of the existing worship center from 1,600 seats to 2,000 seats. The Planning Commission approved the proposed modification to the Conditional Use Permit for the campus on June 9, 2015. Grading, building and landscape plans for the first phase (45,414 square foot new children’s building) are being reviewed by staff and Esgil. 

Residential 

  1. Oak Creek (Developer: Jason Han, New Urban West)No change from the following update reported last week: This project is a 65-unit single family development located at the southeastern corner of Felicita Road and Hamilton Lane approved by the City Council in 2015. The LAFCO Board unanimously approved the annexation on October 5, 2015, and the annexation has been recorded. No grading or improvement plans have been submitted by the developer at this time. 
  1. Amanda Estates (Developer: Jason Han, New Urban West) No change from the following update reported last week: This project is a 22-unit single family development on Amanda Lane approved by the City Council in 2015. The LAFCO Board approved the reorganization (annexation) at their meeting on August 3, 2015, and the annexation has been recorded. No grading or improvement plans have been submitted by the developer at this time. 
  1. Pradera (Developer: Moses Kim, Lennar Homes)No change from the following update reported last week: This project consists of a 70-unit single family development located at the northeastern corner of Ash Street and Lehner Avenue. The developer has obtained building permits for six phases involving 52 homes and those phases are under construction. Homebuyer interest in the product remains high and sales are progressing.  All five final maps in the project have now recorded. Precise grading plans for all phases have now been approved.  Phases 7 and 8 for the construction of 11 additional homes were received on December 12, 2016. 
  1. Lexington (Zenner) (Developer: Eric Johnston, KB Homes) – The project is a 40-unit, single-family development at the northeastern corner of Lehner Avenue and Vista Avenue. The three model homes on the eastern side of Ash Street are now open and sales are progressing as expected. A rough grading permit was issued for the project site on August 18, 2016 and grading is underway. The final map has been approved by City Council. The precise grading plan for Phase 1 has been approved. Building plans for Phase 1 were submitted into plan check on December 20, 2016 and permits were issued before the end of the year.  On January 24, the Planning Commission approved a variance request from KB Homes to reduce perimeter wall setbacks for residential five lots. 
  1. Stella Park Condominiums (Developer: Edward Kaen, ETP, LLC) – This project is a 65-unit, three-story townhome Planned Development located at 2516 S. Escondido Blvd. The project includes three separate recreation areas for residents. The City Council approved the project on April 27, 2016. A Substantial Conformance TM and proposed modification to the Precise Development Plan was filed by Lyon Homes on December 12, 2016. All departments are working steadily to provide necessary information to meet Lyon’s timeline and a staff letter covering both tentative map and architectural comments was provided to Lyon Homes on January 6. Revised plans were submitted on January 13, and are now being reviewed by staff.  It is anticipated the Planning Commission will consider the Precise Development Plan on February 14. 
  1. Wohlford (Developer: Jack Henthorne) No change from the following update reported last week: This project is a 55-unit single family development located on Bear Valley Parkway east of Encino Drive. A Specific Alignment Plan for Bear Valley Parkway detailing the proposed roadway design is under review. The EIR consultant has submitted the first screencheck version of the Draft EIR for staff review. Staff has provided comments and a second screencheck is expected by the end of January. An application for a Development Agreement has recently been submitted by the applicant. 
  1. Latitude II (Developer: Peter Zak, Lyon/NCA)No change from the following update reported last week: This project is a 112-unit multi-family development, located at the northeastern corner of Centre City Parkway and Washington Avenue, and approved by the City Council on August 19, 2015. A Final Subdivision Map has been submitted for review and is awaiting approval of a boundary adjustment for a property exchange with the adjacent motel owner. The Final Map is scheduled for City Council approval on March 1. Grading and building plans are nearing approval. 
  1. Canyon Grove Estates Tract 932 (Developer: John Vance, Shea Homes) No change from the following update reported last week: This project is a 179-lot single family residential development on the north side of Vista Avenue east of Conway Drive. The final architectural design and landscaping plans for the Precise Plan application were approved by the Planning Commission on June 14, 2016. Building plans for the construction of eight model homes have been issued and construction is underway. Building permits for 16 additional homes are nearly ready to issue and the remainder of the homes are now in for building plan check.  The applicant is coordinating the plan review for off-site street improvements on Ash Street with the County’s Department of Public Works. 
  1. Safari Highlands Ranch (SHR) (Developer: Jeb Hall, Concordia Homes) No change from the following update reported last week: This project is a 550-unit single family development located east of the Rancho San Pasqual community and north of the San Diego Safari Park. The project involves 1,100 acres including annexation and a Sphere of Influence update for a master planned community with parks, trails, recreation center, fire station and open space. Planning and Engineering extensions of staff have been funded by the applicant and retained to assist the City in processing the project. The City Council approved the consultant contract for preparing the EIR on March 23, 2016. The contract planner has been meeting with the consultant, Michael Baker International (MBI), and has started review of first draft sections of the EIR. While the EIR is generally on schedule, there have been some changes to the site plan, which will affect the EIR schedule. The changes include the elimination of the “water factory” for wastewater treatment, elimination of the public park, changes to the entry road which would now be private instead of public, and relocation of the fire station to the former public park site. These changes will require the applicant’s civil engineer to make a number of revisions to the tentative map, but are not anticipated to affect the proposed development envelope or the number of proposed lots. A revised tentative map depicting the site plan changes was submitted on October 17, 2016, and is being reviewed by staff and the contract planner. 
  1. High Pointe Tract 693-J (Developer: Russell Schaeffer, True Life Communities) – No change from the following update reported last week: This project is a custom-home development with 39 estate lots accessed from Mesa Rock Road. Staff has prepared a bond and fee letter based on the proposed grading and landscape plans, and has sent it to the applicant. 
  1. Del Prado (Developer: Kerry Garza, Touchstone Communities)No change from the following update reported last week: This project is a 113-unit townhome-style Planned Development located at the southwestern corner of Brotherton Road and the Centre City Parkway frontage road. The project includes a recreational facility, pool, and open space areas. Staff worked through various site design and utility issues with the applicant prior to scheduling the project for a public hearing. The City Council approved the project on May 11, 2016. No grading or improvement plans have been submitted by the developer at this time. 
  1. 701 San Pasqual Valley Rd (Developer: Bob Stewart)No change from the following update reported last week: This project is a 19-unit single family development located at 701 San Pasqual Rd/1201 E. 5th Avenue (formerly Tract 898) on 7.2 acres. The application is under review and a letter detailing additional comments and submittal requirements was forwarded to the applicant. Additional information and revised plans were submitted to the Planning Division on June 13, 2016. Planning Division has reviewed the submittal and informed the applicant that it is still incomplete. 
  1. Veterans Village (Developer: Veterans Village of San Diego) No change from the following update reported last week: This project is a mixed-use development involving a 54-unit affordable multi-family residential apartment project for military veterans and their families. It includes on-site administration office, business center, club house and other support spaces for the residents; and a small commercial component to support training opportunities offered at the facility at 1556 S. Escondido Boulevard. Building plans have been submitted for review and comment; the grading plans and landscaping plans have been approved. Demolition has been completed. 
  1. Escondido Gateway (Developer: Greg Waite, Integral Communities)No change from the following update reported last week: This project is a mixed-use development involving 126 residential units within three, 4-5 story buildings with indoor and outdoor recreational areas and an opportunity for a small (1,000 sq. ft.) commercial/flex space on 2.6 acres (48 dwelling units/acre) located at 700 W. Grand Avenue (former Police Station) across the street from the Escondido Transit Center. Plans were submitted for the project involving a Specific Plan Amendment, Tentative Map, Planned Development and Development Agreement. The City Council approved the project on October 12, 2016. Grading plans and a final map were submitted on November 17 and November 21, 2016, and are currently being reviewed by staff. The Development Agreement has been recorded. Building plans were submitted into plan check the week of December 11, 2016.
  2. The Villages at Escondido Country Club (Developer: Jason Han, New Urban West, Inc.) – The project would redevelop the former 109.3-acre Escondido Country Club golf course property with a new residential development consisting of 392 dwelling units including single-family detached and attached duplex units. The proposed project density is 3.6 dwelling units per acre with a minimum residential lot size of 2,555 square feet. The development would include 46 acres of open space including a landscaped greenbelt with a four-mile trail system linking park features. Other proposed amenities include a new clubhouse building, swimming pool, gym, tennis/pickle ball court, restaurant and bar and banquet facilities. The proposed General Plan Amendment, Specific Plan, Vesting Tentative Map and Zone Change applications and plans were submitted to the Planning Division on October 31, 2016. The developer has retained Dudek to prepare the Draft EIR for the project. The developer will fund a contract planner working under the direction of the Planning Division to assist the City in processing the project. A kick-off meeting was held on November 15, 2016, to commence project-related discussions between Planning staff and their contract planner, the applicant and the EIR consultant. A letter indicating the project application is incomplete was sent to the applicant on November 30, 2016. City staff met with the applicant on December 22nd to review the comment letter. It was conveyed to City staff that the applicant will resubmit in early 2017. A Notice of Preparation (NOP) for the EIR was issued on January 25 for a 30-day review period ending on February 24. The NOP includes notification of a public scoping meeting to be held on February 13. Planning staff has developed a new section on the city’s website for ECC project-related documents and plans.  The information can be accessed at the following link:            ECC - City of Escondido
  1. Ivy/Valley Parkway Mixed-Use Development (Developer: Abad Rahan Pars Inc./ Norm Wieme, Architect – This project consists of a plot plan application to construct a four-story building with 20 two-bedroom apartment units and approximately 3,000 square feet of commercial space on a vacant 0.5-acre parcel located at 113 N. Ivy Street. The conditional letter of approval for the plot plan was approved and issued on September 19, 2016. The applicant has indicated that grading and building plans are expected to be submitted into plan check soon.

Building Division: 

  1. The Building Division issued 76 permits on this short holiday week with a total valuation of $1,130,031. 
  1. Twenty photovoltaic permits were issued for the week. The Building Division has issued 42 solar permits this year compared to 65 issued for the same time last year. 
  1. Counter technicians assisted, on average, 33 customers per day with 23 customers on Friday. 
  1. Building inspections averaged 23 inspections per day with 24 inspections on Friday. 
  1. Projects nearing permit issuance are: 
  1. Latitude 2, a 112-unit apartment complex consisting of six, three-story buildings at 610-660 Centre City Parkway. 
  1. Veterans Village, at 1540 S. Escondido Blvd., a 40,000 square foot, three-story apartment building providing affordable housing for veterans and their families. 
  1. The construction of the City Plaza three-story mixed use building at 300 S. Escondido Blvd. has completed the podium slab and second floor wall framing is progressing. 
  1. The Solutions for Change affordable housing project at 1560 S. Escondido Blvd. has started wall framing for the project. 
  1. Roof framing is proceeding at The Meadowbrook three-story apartment building with underground garage at 2081 Garden Valley Glen. 
  1. SDG&E is completing a utilities upgrade at Greencrest Mobile Home Park at 541 W. 15th Avenue and will be starting upgrades soon at Town and Country Mobile Home Park at 2280 E. Valley Pkwy and Citrus Gardens at 211 S. Citrus Ave. 
  1. Escondido Disposal is receiving underground inspections for their conveyer pits associated with their large expansion and remodel. 
  1. The Shea Homes 178-lot Lexington and Estates single-family residential development has received exterior frame and roof sheathing inspections for eight model homes. 
  1. The Calvin Christian new chapel and auditorium at 2000 N. Broadway has received masonry grout inspections for their exterior walls and roof framing is proceeding. 
  1. Permits were issued for the rebuild of the church destroyed by fire at 950 Ohio Ave. 
  1. Plans were submitted for three new single family dwellings on Tangelo Way.

Code Enforcement: 

  1. As of January 24, the total number of open code enforcement cases is 646 cases. During the prior week, 62 new cases were opened, and 80 cases were closed, with a backlog of an additional 37 cases not yet opened for assignment and investigation. 
  1. A total of 35 illegal signs were confiscated during the weekend. 
  1. Last week, the Business License Division issued 57 new licenses and received 27 new applications, in addition to 102 renewals. Thirteen (13) businesses closed and/or closed out their business licenses. 

ENGINEERING 

CAPITAL IMPROVEMENTS

2015/2016 Street Rehabilitation and Maintenance Project

The contractor may resume striping operations along with the placement of pavement legends on Thursday, January 26 during a break in this week’s rain events. The resubmittal of the remaining striping plan is expected this week with final striping being installed on these streets in the coming weeks. The tree planting has not begun at this time due to the heavy rains being experienced in the area.  

PRIVATE DEVELOPMENT

Pradera - Lennar Communities
No changes from the following reported last week: Final pavement installation has been delayed due to the multiple rain events being experienced this month. All work when scheduled will be performed during off peak hours and in conjunction with the other two projects in the area. 

Lexington Model Homes - KB Homes
The installation of the sewer system along Ash Street between Lehner Avenue and Vista Avenue is completed which includes the placement of temporary hot asphalt resurfacing of the multiple trenches to ensure public safety. The contractor is onsite managing the 6” of rain that the area experienced over this past weekend. 

Escondido Boulevard at 3rd Avenue
No changes from the following reported last week: The contractor has removed the false work on the first floor and preparing to move to the second floor. Lane closures along 3rd Avenue will be a regular occurrence to allow for the lifting of construction materials to the newly completed second floor. 

Tract 932 - Canyon Grove Shea Homes Community
The importing of material has been halted until the project can address the saturated soil and water condition present on site from this last weekend’s 6” rain event. Work on the new traffic signal installation at the Ash Street and Sheridan Avenue intersection will resume later this week after a period of drying. 

Quantum Academy at Falconer Road
Escondido Elementary School District is installing a new water main to the existing facility. The contractor is working onsite and will not be in the public right of way until after January 28th

Veterans Village 1556 S. Escondido Boulevard
No changes from the following reported last week: The grading of the project has begun. 

Latitude II Condominiums by a Lyon Homes Partnership: Washington Avenue at Centre City Parkway
The contractor resumed installation of the water quality devices last week in advance of the anticipated storm. The project is once again under water from the 6” rain event that the area experienced this past weekend. No activity can be expected until the project has a period of time to dry out.   

Westminster Theological Seminary Graduate Student Housing: Boyle Avenue at Bear Valley Parkway
The contractor is installing the new water main along the Bear Valley Parkway side of the project this week. 

Talk of the Town
The contractor has been delayed from constructing the two ornamental street lights along Centre City Parkway. The project will resume after a period of drying out. 

Tract 877 – Bernardo Ave. by Ambient Communities
The project is a 13 lot single family residential project located at the cul-de-sac end of Bernardo Avenue. The project is idled due to the period of rain the area has been experiencing. The contractor performing the construction of water and sewer services may start this week after a period of drying out. 

Palomar Medical Center
To help facilitate construction of new facilities on the main campus, on street parking will be permitted temporarily along Citracado Parkway from Auto Parkway to Harveson Place for the next 7 months. The hospital provides free shuttle service during normal business hours.    

POLICE 

INCIDENTS 

  • On 01/15/17 at 09:44 hours, witnesses called police to advise that a male lit a sign on fire at Grand Avenue and Maple Street.  He reportedly sprayed the sign with an accelerant and ignited it.  A description of the suspect was obtained and broadcasted by dispatch.  Officers located the male suspect and arrested him for Felony Arson.  Fire responded to the scene to render it safe.   The crime was partially captured on city video cameras.  The victim is John Paul the Great Catholic University and there is no indication that this is a hate crime.  The total loss value is estimated to be $10,000.
  • On 01/15/17 at 22:38 hours, an officer contacts two subjects for being in the flood control channel after hours.  The male subjects refused to comply with commands and walked away from him eastbound.  The subjects separated and one headed toward Soapy Joe’s car wash while the second continued in the flood control channel.  An officer located the male at the car wash parking lot who ignored several verbal commands.   The officer requested Code-3 cover and, after a minor use of force, gained control of the suspect and places him under arrest.  The second suspect was also located and placed under arrest. There were no injuries sustained by the officers or the suspects.  Charges include Possession of a Controlled Substance, Felony Warrant, Resisting Arrest and Public Intoxication. 
  • On 1/17/17 around 02:51 hours, officers were dispatched to Super Cuts at 501 W. Felicita Ave for an audible alarm.  Officers arrived on scene in 2 minutes to find the west facing window broken out.  The owner was notified and responded.  There is no suspect information at this time.
  • On 1/17/17 around 03:03 hours, officers were dispatched to Pegah’s Kitchen, 912 S. Redwood Street for an audible alarm.  Officers arrived on scene in three minutes to find a glass door broken out.  After an interior search, no suspects were located.
  • On 01/19/17 at approximately 14:14 hours, officers were dispatched to the area of Jordan and Kenora regarding a fight in progress involving multiple subjects armed with hammers. Officers arrived on scene and located two juvenile male victims. It was determined that a group of possibly four or more suspects approached the victims, asked them who they ran with and then began assaulting them with a hammer and possibly other objects. Officers arrived on scene a short time later and detained a male suspect who was identified as being involved. He was arrested for Assault with a Deadly Weapon. The two victims were transported to Palomar Medical Center to be treated for their injuries.
  • On 01/20/17 at approximately 18:15 hours, three black males, one wearing a red track jacket and two wearing black hooded sweatshirts, took nineteen iPhones from the display tables at the Apple store at Westfield Mall.  In what appeared to be a coordinated theft, the suspects forcefully removed the phones from their security cords, causing the alarm to be activated.  The three suspects quickly exited the store and headed toward the mall exit near the Cheesecake factory. 
  • On 01/21/17 at approximately 19:14 hours, an unidentified black male entered the Subway at 331 W. Mission Avenue and produced what appeared to be a black semi-automatic handgun. The suspect demanded cash from the register. The employee complied, and the suspect exited the store and fled on foot in an unknown direction. The suspect was described as wearing a black t-shirt and gray pants. A search of the area was unsuccessful.
  • On 01/21/17 at 20:35 hours, dispatch received a call for service referencing an armed robbery at the Holiday Wine Cellar.  The subject matched the description of the earlier armed robbery suspect from the Subway restaurant.  Patrol units arrived on scene rapidly, and were advised that the suspect had fled on foot to a room at the Palm Tree Lodge.  Units established a perimeter around the motel.  Officers on scene utilized the Bearcat and after several PA announcements and phone calls into the room, the suspect exited and was taken into custody without incident.  He was booked into the Vista Detention Facility on both counts of Armed Robbery. 

EVENTS 

  • On Sunday, 1/15/17, Chief Carter, Captain Loarie, Captain Kogler, Sergeant Leso, Officer Mougier, Officer Kluka and members from the Explorer Post represented the City in the annual San Diego Martin Luther King Jr. parade.