Brine Line Project
Project Description:
The Brine Line Project extends the existing brine transmission pipeline along Escondido Creek from Broadway and Woodward (near Grape Day Park) to the existing brine line in Harmony Grove Road, a few hundred feet upstream from the Hale Ave Resource Recovery Facility. This project will construct approximately 12,200 lineal feet (2.3-miles) of polyvinyl chloride (PVC) brine gravity pipeline using a combination of open trench and jack-and-bore methods. This project also includes the construction of manholes, air-vacuum valves, and small diameter fiber optic conduits.
Completion for construction is anticipated for June 2019.
Contacts:
Sam Lopez - Field Engineering Inspector; (442) 777-8842
Randy Manns - Utilities Construction Project Manager; (760) 839-6290 x7031